As of this picture, the fuselage was half covered, first ironing done, and ready for the other side.
As of today, Sunday, both sides are covered, ironed, Poly-Brushed, reinforcing taped, and the drain grommets installed. Tomorrow, if things go well, I will do the final ironing to smooth out any wrinkles in the tape and reinstall the landing gear. Once those two items are checked off, the fuselage is ready for the paint shop !!!