Challenger II

October 21, 2008

right wing done

Filed under: Uncategorized — pocomoonshine @ 8:37 pm

Back at building after a short break for visits with family and household chores.

Both wings are now completely installed, including the ailerons. Next chance I get, probably after the election, it is on to adjusting the ailerons. After that, fitting the doors, putting on the top fiberglass panels, and then a windshield.

October 4, 2008

jury strut

Filed under: Uncategorized — pocomoonshine @ 7:01 pm

After a short break to finish up the screen doors I am back to the airplane building.

Given a bundle of aluminum tubing, some brackets and a pile of rivets, look at what I created today!

Blog at WordPress.com.